PRIMARY METERED FACILITIES

MAXIMIZE PRIMARY METERED POWER, STREAMLINE PERMITTING WITH
ALL-IN-ONE
CENTRAL UTILITY WORK.

Stay Focused with Streamlined Communication 

When you’re planning a high voltage distribution project, you need a primary metered site. Securing central utilities requires intensive communication with utility companies, permits, and more. Stay focused on general construction, timelines, and client satisfaction.

Deerfield will streamline your primary metered project, from handling regulations and utility communications, to transformer installation and high-voltage line connection.

PRIMARY METERED SITES FOR HIGH-POWERED INDUSTRIES

Mining

High load requirements for mining make primary metered sites a no-brainer. Dedicated meters make sure your mining facility can handle the load at any time.  

Manufacturing

As manufacturing ramps up or requirements change, so do your load requirements. Primary metered sites ensure your site can handle increased load capacities when required. 

PRIMARY METERED SITES SAVE MONEY FOR PLANTS WITH HIGH ENERGY CONSUMPTION

Your primary metered project needs a high-voltage current and your own transformer to avoid the high kilowatt per hour costs that come with secondary metering.

YOUR PRIMARY METERED PROJECTS ARE MORE THAN CONSTRUCTING POLE LINES

Keep your project efficient and on track with electrical contractors that do more than just construction. Deerfield takes on all the requirements for your primary metered projects so you don’t have to.

  • Interfacing with utility companies
  • Securing city, township, state permits
  • Obtaining materials and supplies
  • Constructing utility poles
  • High-voltage line connection xxx volts/amps

POWERED PRIMARY METERED FACILITIES

12,470 Volts Industrial Sand Mining Plant

Interfaced with the local utility company to secure the max amount of allotted power for the site. Worked with the utility company to design regulated overcurrent protection and wire sizing.

Completed the project on time to keep the construction timeline on schedule.

12,470 Volts Industrial Sand Mining Plant

Interfaced with the local utility company to secure the max amount of allotted power for the site. Worked with the utility company to design regulated overcurrent protection and wire sizing.

Completed the project on time to keep the construction timeline on schedule.

The Deerfield team has never disappointed me.

The team at Deerfield has worked on all parts of the plant’s operation in emergency and capital upgrade capacities. I have been working with Deerfield for five years now in my current position as Plant Manager. The Deerfield team have never disappointed me and are always available when we call them 24-hours a day for any issue or emergency.

Brian Lenhart, Plant Manager at Covia Solution’s Dividing Creek NJ Plant

INCREASE POWER TO YOUR PRIMARY METERED SITE, SAVE TIME AND MONEY